Water tower from Bielefeld with masonry entrance area, clinker tower and spherical water holder. Such water towers are not only used in the service area, but also for the water supply of towns.
Set comprised of a curved viaduct with track bed and high piers. A set of bridge abutments and an additional pier allowing to lengthen the bridge are part of the kit. Suitable for Märklin C track and all other track types.
A FALLER highlight in new design. Set comprised of a three-stall engine house in half timbered building style with water tower at the rear. For engines up to 162 mm length over buffers, gate height 36 mm, spacing of tracks from centre to centre 37 mm. Set also includes two floor jacks with supports, a locomotive tube cleaner, a water sprout and a loading gauge.
Professional mechanical equipment for metal-working companies. Set comprised of milling machine, pillar drilling machine, reciprocating hacksaw, turning lathe, tool board on the wall and various forging tools.
Bricks-and-mortar-built, with 2 shelters for locomotives up to 270 mm length over buffer._x005F_x000D_
Gates feature springs which automatically shut them again after an engine has passed through._x005F_x000D_
Catenary operation possible.
This equipment controls and also programs four connectable servos. The same as our new controls, these can also be controlled completely analogue or digital via a corresponding control. Connects via 16 V, AC voltage.